Feedstock and finished product
Prepare photos or video, source, constituents, physical form and completed preparation steps. State intended pellet use, target rate and a proposed acceptance method.
Site and utilities
Provide site dimensions, voltage and frequency, cooling-water conditions, handling routes and destination. Electrical, safety and emission requirements need project-specific review.
Quotation and delivery
Clarify whether conveying, filtration, cutting, storage, spares and installation guidance are included. Agree trials, acceptance, packaging, transport responsibilities and delivery terms.

